The most effective ERP for child parts (cp) manufactured in-house which are converted from raw materials into a subassembly. Then, subassemblies are assembled to form the final product.

Child Part, Sub Assembly & Product Assembly with Free ISO 9001 Integration.

Model Name: DI-Double BOM Premium. Model Number: H – 8.

Who can benefit from the above ERP software?
  1. A enterprise that manufactures child parts in-house and then assembles them with other child parts to create a subassembly. These subassemblies are inspected before becoming the final product.
  2. Do you require inventories of raw materials, child parts, subassemblies, or completed assemblies?
  3. Do you want RM Inventory to be automatically deducted or an auto letoff?
  4. A entity who wants to get the “approved vendor” tag from an OEM customer and maintain approved status by receiving high audit rankings or ratings from the customers.
  5. Showcase your high-quality, implemented ISO systems to earn compliments and build customers' trust and confidence in order to acquire orders.
  6. Are you looking for a perfect fit software for sheet metal fabrication, tool manufacturing designers, steel part manufacturing, mild steel & stainless steel part assembling?
  7. An organisation that only wishes to invest in ERP and receive free ISO 9001:2015 implementation.
How ERP can help a SME or a small business owners?
  1. Do you wish to implement systems to efficiently manage your business?
  2. Do you wish that route card be printed and manufactured in accordance with the QCP?
  3. Do you wish for the manufacturing process to be automated via route cards?
  4. Before assembly, does your assembly line stop for lack of a specific raw material?
  5. Do you wish to setup an automatic inspection system and record inspection parameters for a raw material?
  6. Does your assembly line stop due to the absence of a specific child component just prior to assembly?
  7. Do you need a BOM, i.e., a child part to an RM, a child part to a subassembly, and a subassembly to the final assembly, for a particular product?
  8. Do you wish to setup an automatic inspection system and record inspection parameters for a child component?
  9. Would you like to establish inspection parameters so that employees know which parameters must be inspected?
  10. Do you wish to arrange an automatic inspection system and record subassembly inspection parameters?
  11. Do you wish to establish an automatic inspection system and document inspection parameters for final assemblies?
  12. Are you are interested in the performance of the supplier, through ratings? /li>
  13. If You Want to Have a Know the Supplier Performance Through Ratings.
  14. Do you wish to establish the minimum inventory levels for raw materials?
  15. Do you wish to establish and monitor the raw material price list?
  16. Do you wish to be aware of the RM inventory levels at all times?
  17. Do you want to know the inventory levels of child parts at any given time?
  18. Do you wish to be aware of the subassembly inventory levels at any given time?
  19. Do you wish to establish the minimum and maximum stock levels for each raw material?
  20. Do you wish to establish and monitor the raw material price list?
  21. Do you want to define the sequence of inspections and inspect as per the defined sequences.
  22. Do you want to map the drawing dimensions into QCP and record such parameters continuously, consistently, and continuously?
  23. Do you wish to establish and track vendor receipts in accordance with the DC sent?
  24. Do you wish to establish and track the parts shipped to the vendor and their receipts in accordance with the DC you sent?
  25. Do you wish to regulate, monitor, and control customer order levels?
  26. Are you interested in the order delivery patterns of your customers?
  27. Do you want this in-house child part to be produced with your in-house machines?
  28. Want to know which lot of RM was used to manufacture which lot of product or child's parts?
  29. Do you wish to track machine breakdown, and repair costs?
  30. Do you wish to keep track of the tool's life, its service and repair expenses?
  31. Do you wish to track the costs associated with instrument calibration, maintenance, and repair?
  32. Do you wish to instantly review customer complaints, events, patterns, frequency, reasons, and your actions?
  33. Are you interested in utilising tracking system to monitor the performance of your department?
  34. If you want your business systems to be integrated with iso 9001 2015, quality management systems.
  35. If you want a free iso 9001 2015 implementation.
Industry-specific manufacturing ERP?
  1. Yes, we offer ERP software designed specifically for plastics, rubber, machining, fabrication, tooling, assembly, and testing industries.
  2. Any manufacturer who produces the child parts (cp) with in-house machining division & wants the inventories of such child parts. Sub-assemblies are created by assembling child parts. Then these sub-assemblies are finally assembled to become a final product.
  3. child parts that are manufactured with an in-house division.
  4. The perfect fit solution for fabricators, toolmakers, and child part assemblers.
  5. The product has two BOMs.
  6. A separate drawing and drawing number for each deformed processes of a child part.
  7. A drawing for every subassembly.
  8. A drawing for final assembly.
Low-Cost and Cost-Effective Best ERP for Indian SME's and small business owners: Manreqa ERP Software useful for:
  1. Investment.
  2. A desire to become a MNC.
  3. Dedicate time to understanding and practise.
  4. Utilize the tool to its maximum capacity.
  5. A management team that desires to oversee and manage the machine shop.
  6. A manager who wishes to monitor the life of a tool.
  7. Who desires to know the performance of the machinery?
  8. As a policy of management, each product, subassemblies, child part, RM must have a QCP.
  9. As a rule of management, drawings should be available for each step or processes involved in manufacturing of a child part.
  10. As a management policy, unless a RM receiving inspection is carried out & recorded, no child part shall be produced.
  11. As a matter of management policy, no subassemblies shall be made until a child part inspection has been done and recorded.
  12. As a management policy, no final assembly occurs unless a subassembly is inspected and recorded.
  13. Child Part inventory shall be online at any given point of time.
  14. Sub assembly inventory shall be online at any given point of time.
  15. Final product or assembly inventory shall be online at any given point of time.
  16. Inventory RM must be available online at all points of time.
  17. Employees must be able to devote time each day to producing accurate data and maintaining records.
  18. A manufacturer that wants to prove that they produce quality products, & have systems that are practiced at any given point of time.
Computerize various departments with Manreqa ERP: The extent of computerization is described below:
  1. Incoming Register: Customer Order (A 1).
  2. Contract List: Order Acceptance (A 1).
  3. Supplier PO (Print of PO) (D 4).
  4. Supplier GRN (Print of GRN) (D 4).
  5. Stores: Supplier GRN Inspection (E 5).
  6. Vendor (Print of DC) (D 4).
  7. Vendor GRN (Print of GRN) (D 4).
  8. Vendor GRN Inspection (E 5).
  9. Drawing Register (D 4).
  10. QCP (D 4).
  11. CAR (D 4).
  12. Customer Feedback (D 4).
  13. Calibration Status (E 5).
  14. Related MRM Analysis & Graphs (D 4).
  15. Report Module. Data by Reports I.e. Status Reports. (C 3).
  16. Plus The Double BOM Modules (F 6).
  17. Plus The Production Scheduling - Stock (F 6).
  18. Assembly Route Card Print (F 6).
  19. The Child Part Assembly – CP Sub Assembly (G 7).
  20. Sub Assembly Inspection (G 7).
  21. The Final Assembly (F 6).
  22. The Final Assembly Inspection (G 7).
  23. Child Part Route Card. (H 8).
  24. Main Assembly Route Card. (H 8).
  25. Sales Invoice (H 8).
  26. Plus CP Manufacture Route Card Print (H 8).
  27. Plus The Child Part Production Progress (H 8).
  28. Plus The Child Part Inspection (H 8).
  29. Scan Documents & upload in ERP. (H 8).
  30. Marketing Module (J 10). (H 8)
  31. Comparative Analysis systems (H 8).
Subscription Cost or Manreqa ERP Software Pricing:

Price : ₹ 3,324=00 per Month, Per User, Paid on Yearly Basis ₹ 39,888=00.
Get attractive discounts for a minimum of 5 users, with different pricing structure that have 30% Subscription Licenses fee on yearly basis.

ERP Training:

Yes : Only By Online Videos:

ERP Installation Support:

Yes : Online.

Manreqa ERP Online Training:

1) Online training is not required, as ERP is easy to use and there are plenty of ERP videos available for users to train themselves on how to use the software.

2) For clients who need online training, additional fees will apply, ranging from per-week training fees to the monthly training fee. The cost of online training is not covered in the section titled "Price or Cost of Manreqa ERP Software" above.

Definitions & FAQ's:

1) What is a Route Card?

2) What is a Child Part?

3) What is a Sub Assembly?

4) What is a Final Assembly?

5) What is Scrap?

6) What is Tool History?

7) What is Tool History Card and why it is Essential?

8) What is Machine History?

9) What is Machine History Card and why it is Essential?

10) What is Instrument History?

11) What is Instrument History Card and why it is Essential?

12) What is Inspection?

13) What is Injection Moulding?

14) What is Extrusion Processes?

15) What is Full Form of FRP ?

16) What is Machining Process?

17) What is Aluminium Ingots?

18) What is Welding Process?

19) What Role has Nuts & Bolts in Fabrication Process?

20) What do you Mean by Riveting Process?